Auditing your charging sessions requires three primary data points. Follow these steps to generate your timeline:
- Step 1: Enter Usable Battery Capacity
Consult your owner's manual for the "Net" or "Usable" kWh. This is the actual energy buffer available for driving.
- Step 2: Input Current & Target State-of-Charge
Define where your battery is now and where you want it to be. For most daily needs, a 20% to 80% audit is recommended.
- Step 3: Define Charger Output
Enter the kW rating of your station (e.g., 11 kW for Home Level 2, or 150 kW for DC Fast). Click "Calculate Charge Time" to reveal your session roadmap.
Managing AC vs. DC Loss
Our engine automatically applies a standard 10% inefficiency factor for AC (Level 1/2) charging to account for the heat lost during the DC conversion process. For DC Fast Charging, this factor is reduced as the energy flows more directly into the pack.